Loading Experience...
Pull to return to Portfolio Home
Back to Portfolio

S&C Electric

Manufacturing Engineering Intern

Jan 2026 - Apr 2026

Engineered line-side manufacturing fixtures reducing cycle time by ~30%. Built Power BI dashboards from Azure data to cut safety review time by ~64%. Developed VBA inventory trackers and implemented Kanban systems to reduce material downtime.

S&C Electric

Key Contributions

Project Media
Data Pipeline
KPI Trends
S&C ELECTRIC2026

Manufacturing Review Dashboards

Power BI dashboards transforming raw safety & hazard records into repeatable KPI views.
64%Time Saved
-86%Manual Work
100+ logsData

The Challenge

Converted scattered safety and hazard logs across production groups into visual KPI tools for weekly production and quality reviews. Focused on faster issue escalation, clearer ownership, and better visibility into operational risk.

The Approach

Built Power BI dashboards from Azure-linked TeamAssurance data tables, using Power Query and DAX measures and structured slicers. Transformed raw safety and hazard records into repeatable KPI views for overdue actions, ownership, backlog, and department-level trends.

The Impact

Reduced weekly production review time by ~64% from ~51 min to <18 min by replacing manual log searches. Cut manual filtering work by ~86% through standardized data aggregation, slicers, and prebuilt drilldown tables. Improved open-action visibility across 100+ safety and hazard records.

Project Media
VBA Logic
Kanban Integration
S&C ELECTRIC2026

Material Flow Dashboard

Line-side tracker for hardware inventory, shortages, and reorder status.
-70%Lookup Time
-60%Update Time
100+ partsVisibility

The Challenge

Built a line-side tracker for hardware inventory, shortages, reorder status, and part lookup. Targeted manual tracking issues causing part-search delays, unclear stock levels, and missed replenishment signals.

The Approach

Developed Excel VBA workflows for inbound, outbound, live inventory, and part lookup using structured tables and formulas. Built dashboard views for inventory health, critical parts, warning items, top shortages, and reorder triggers.

The Impact

Reduced part lookup and inventory review time by ~70%, from 10 min to under 3 min, by centralizing hardware records. Improved shortage visibility across 100+ hardware transactions. Cut manual update friction by ~60%.

Project Media
Assembly Detail
Fabrication Drawings
S&C ELECTRIC2026

3-Axis Assembly Workbench

Custom assembly workbench replacing cart-based workflows for rollerdeck production.
-30%Cycle Time
Welded FrameType
SolidWorksDesign

The Challenge

Engineered an assembly workbench to replace cart-based workflows and support rollerdeck-floor production. Targeted operator access, hardware storage, tool organization, and mounted-arm integration.

The Approach

Built SolidWorks CAD, BOMs, sheet-metal drawings, and assembly documentation for fabrication. Iterated around floor-space limits, Atlas Copco arm reach, hardware bins, drawer storage, and operator feedback.

The Impact

Advanced design from concept to welded sheet-metal frame with fabrication-ready documentation. Improved line-side organization with integrated hardware storage, tool drawers, and dedicated arm support. Reduced assembler cycletime by ~30%.

Scroll down or click for Paragon Systems