May 2025 - Aug 2025

Executed high-cycle vibration and IP validation testing. Designed modular test fixtures in SolidWorks, increasing throughput by 20%. Automated test-log post-processing using Python to reduce reporting cycle time from hours to 15 minutes.

Paragon Systems

Key Contributions

Project Media
Custom Brackets
Testing Data
PARAGON SYSTEMS2025

Dust Collection Systems

Centralized lab airflow system upgrade reducing inefficient duct reruns.
+10.5%Airflow
3 to 8 stnCoverage
-76%Budget

The Challenge

Upgraded a scattered dust collection setup into a centralized lab airflow system. Targeted poor capture, limited station coverage, and inconsistent cleanup around material prep and fixture areas.

The Approach

Mapped duct runs, measured velocity, calculated CFM, and verified airflow before and after install. Installed ducting, blast gates, quick-connect drops, brackets, and serviceable filter access points.

The Impact

Increased point-of-use airflow by ~10.5% through controlled drops and improved duct routing. Expanded coverage from 3 to 8 stations while reducing inefficient duct reruns by ~22%. Delivered the upgrade ~76% under allocated budget.